High School

Ingrid dug a trench that was [tex] \frac{18}{20} [/tex] meters long. The next day, she dug an additional [tex] \frac{9}{20} [/tex] of a meter of the trench. What is a reasonable estimate of the total length of the trench?

Answer :

Indigrid dug a trench totaling 27/20 meters after two days. A good estimate for the total length is approximately 1.5 meters when rounding for a simpler figure.

The student asked about the total length of a trench that Indigrid dug over two days. On the first day, Indigrid dug a trench 18/20 meters long, and on the second day, she dug an additional 9/20 of a meter.

To find the total length, we add these two quantities together:

First Day: 18/20 meter

Second Day: 9/20 meter

Total Length = 18/20 meter + 9/20 meter

= 27/20 meters

To give a reasonable estimate, we might want to convert this to a mixed number for easier understanding. 27/20 is the same as 1 meter and 7/20 meter. Since 7/20 is close to half a meter, a reasonable estimate could be around 1.5 meters in total.