Isaiah Isaiah
  • 22-01-2024
  • Mathematics
College

A construction company pours concrete at a constant rate to make a sidewalk. There are 1,054 cubic feet of concrete available, and 6.2 cubic feet of concrete is poured each minute.

Write the equation that shows the total volume, in cubic feet, of concrete remaining after \( t \) minutes of pouring.

Answer :

3803929 3803929
  • 30-12-2023

Answer:

Step-by-step explanation:picture of problem please

Answer Link

Other Questions

A rectangular plane surface 2m wide and 3m deep lies in water
A persistent nosebleed requires an intervention involving intubation. Which of the following
The physician orders a 75 unit/kg bolus of heparin for the patient.
A boat capsized and sank in a lake. Based on an assumption
The body temperature of a healthy dog follows a normal distribution with
The number of women in medicine continues to increase steadily and can
Why did Daedalus tremble and cry as he fastened the wings on
Which of the following keeps the body in a chronic inflammatory state
How many pounds are in 40 oz?
Fill in the blank belowcrossword​
Mrs. Marks has cheese that weighs \(1 \frac{8}{7}\) pounds to use for
You have 30 boxes of A1 ball bearings in your plant. You
**Integrated Mathematics: Relations and Functions** **3.1 MathXL - Part 3 of 6**
a) For a set of five numbers lower than 20: - The
Given the function [tex]$f(x) = -5x^2 - x + 20$[/tex], find [tex]$f(3)$[/tex].