To make concrete, Hassan needs cement, sand, and aggregate mixed in the ratio 2:5:7. If the quantity of cement used to concrete a building is 3 tonnes, then:

A) How much total concrete can he make?
B) How much sand is needed to make the concrete?

Answer :

Final answer:

To make concrete, the total concrete that Hassan can make is 21 tonnes, and he needs 7.5 tonnes of sand for the 3 tonnes of cement, based on the given ratio of cement, sand, and aggregate which is 2:5:7.

Explanation:

The question involves the application of the concept of ratio in mathematics and an understanding of concrete mixtures. The given ratio for cement, sand, and aggregate is 2:5:7.

This means for every 2 parts of cement used, 5 parts of sand and 7 parts of aggregate are required.

A) In relation to the total mixture, the part representing the cement is 2 out of (2+5+7) =14.

So, when 3 tonnes of cement is used, the total concrete prepared = 3 tonnes * (14/2) = 21 tonnes.

B) The amount of sand required is 5 parts for each 2 parts of cement.

Hence, if 3 tonnes of cement is used, the amount of sand required = 3 tonnes * (5/2) = 7.5 tonnes.

Learn more about Ratios here:

https://brainly.com/question/32531170

#SPJ4