It takes 12 men 5 days to complete a job.

(a) Work out how many days it would take 3 men to complete the same job.

Explanation needed for the answer, which is 20 days.

Answer :

kensley1489 kensley1489
  • 08-12-2023
12 men, 5 days.
If you divide the amount of laborers by 4, you must multiply the time it takes by 4. Thus 12/4=3 men and 5*4= 20 days.
Answer Link

Other Questions

What is the temperature around an airplane flying at an altitude of
Which one of the following is not used for peripherals to communicate
The radius of Earth's moon is about 173, 700, 000 cm. Write
Which of the following Stomach channel points branch out to connect with
The linetype used to define the visible edges of an orthographic view
Examine the statement and balanced equation. Pure elemental iron undergoes a single
Which of the following is NOT considered a peripheral device? A. Motherboard
Which of the following are appropriate techniques when suctioning a newborn? Select
An athlete presents with signs and symptoms indicating a specific finger injury.
(Giving 40 points and brainly if correct!) If OP=17 and QP=6, what
Gender-biased language assumes that gender is A. Binary B. Important C. Unavoidable
If [tex]f(n) = n^2 - 2n[/tex], which of the following options are
Annalee hammered a nail into a piece of wood. Each time she
Find the volume of 0.240 M sulfuric acid necessary to react completely
Which weight is equivalent to 80 pounds? A. 5 ounces B. 50