Answer :
The additional wire, in feet, that the factory needs in order to wrap the deliveries would be = 37.6 feet
That is option B.
How to calculate the remaining length of wire needed in the factory?
The total length of wire needed in the factory to wrap up all the deliveries for the house project = 175 ft.
The lengths of wires available = 2 × 12 yrd = 24 yrd.
But 1 yard = 3 foot
24 yards = X
Make X the subject of formula;
X = 24×3 = 72 ft
The second wire available = 65.4 ft
To calculate the remaining wire first add all the available wire. That is;
= 72+65.4 = 137.4ft
Subtract fro the total wire;
= 175-137.4 = 37.4 feet.
Learn more about length here:
https://brainly.com/question/28108430
#SPJ1